McMillan Engineering Group has supplied two Transfer Beams for the Level Crossing Removal Project in Murrumbeena. The transfer beams are installed as a protection deck over the rail below. Both the elevated rail spans and the main carrier are transferred over the top of the transfer beams.
Transfer Beam Details
- Over 130 tonne of steel
- Over 8400 bolts
- Each beam is over 17 metres long x 7.2 metres wide




